1
← GlossaryAsset · Documentation, reports and plans

Reviewed Nov 20265 min read4 chapters

RMP (Risk Management Plan)

How will the risks be managed?

In one sentence

The RMP is a medicine's written plan: its important risks and knowledge gaps, the studies to close them and the measures that keep patients safe.

In the European Union (EU) it is part of every new marketing authorisation application and stays alive for as long as the medicine is sold. The law calls the activities a risk management system; the plan is its detailed description, in one template with seven parts.

Think of it like this

A used car comes with a service binder: the known faults, what gets checked at each service and what the owner must never do, kept up to date for as long as the car is on the road. The RMP is that binder for a medicine.

Key insights

The plan lists only safety concerns that could change the benefit-risk balance: important identified risks, with evidence of causation; important potential risks, suspected but not proven; and missing information, a gap for a use or a population. Chapter 1 sorts a worry into one of them.

Product overview, safety specification in eight modules, pharmacovigilance plan, efficacy studies, risk minimisation, summary, annexes. One document, the format fixed by the implementing regulation. Chapter 2.

The product information, labelling, pack size and legal status are the routine measures every medicine has. Educational materials, patient cards or controlled access are added only when essential, with a justification and a way to measure whether they work.

Concerns are added, reclassified and removed as the profile firms up; every version is numbered and dated. Since 20 October 2023 the European Medicines Agency publishes the plan of every centrally authorised medicine. Chapter 3.

Jump to: 1 Sorting a worry 2 Inside the plan 3 When it fails 4 Test yourself

Chapter 1

A worry about a medicine. Does it belong in the plan?

Answer the three questions the European Medicines Agency’s good pharmacovigilance practices (GVP) Module V asks of every candidate. The verdict shows what Parts II, III and V of the plan then say about it.

Is the medicine the cause?what the evidence says about the link

Could it change the benefit-risk balance?what makes a risk important

Is the product information enough to manage it?the leaflet, the labelling, the prescribing rules

Verdict: not a safety concern for the plan

Part II, safety specification

It may still be an adverse reaction in the product information, but the plan lists only risks that could affect the benefit-risk balance; the module on identified and potential risks keeps the reasoning for leaving it out.

Part III, pharmacovigilance plan

Routine pharmacovigilance only: adverse reaction reporting and signal detection.

Verdict: important identified risk

Part II, safety specification

An undesirable clinical outcome with sufficient scientific evidence that the medicine causes it, listed in the module on identified and potential risks and in the summary of safety concerns.

Part III, pharmacovigilance plan

Further evaluation: frequency, severity, seriousness and outcome in normal use, and which patients are most at risk, through routine activities or a study.

Verdict: important potential risk

Part II, safety specification

Evidence to suspect a causal link but not enough to conclude it, for instance a signal from off-label or long-term use. Listed with its rationale.

Part III, pharmacovigilance plan

An activity to confirm or refute it: a post-authorisation safety study (PASS), a registry or long-term follow-up of trial patients, tabulated in annex 2.

Verdict: missing information

Part II, safety specification

A gap in knowledge for a use or a population, with a scientific reason to think the profile may differ there. Absence of data alone does not qualify.

Part III, pharmacovigilance plan

How the gap will be filled, for instance a study in the population not yet studied, with a due date for the results.

Part V, risk minimisation

Nothing beyond the routine measures the medicine already has.

Part V, risk minimisation

Routine measures: the summary of product characteristics advising the clinical action, the leaflet, the labelling, pack size and legal status. Listed per concern with the section where the risk appears.

Part V, risk minimisation

Additional measures, only when essential: educational materials, a patient card, controlled access or a pregnancy prevention programme, detailed in annex 6 with a justification and a way to measure whether they work.

GVP Module V, V.A.1, V.B.6 and V.B.8; Implementing Regulation (EU) No 520/2012, Article 30

Chapter 2

What is inside the plan, and when must it change?

Directive 2001/83/EC defines the system; Commission Implementing Regulation (EU) No 520/2012 fixes the content and format; GVP Module V fills in the seven parts.

Guess first

A generic copies an originator that has a risk management plan. Does the generic need its own?

You got it.Not quite.A reduced one. Content is proportionate to the risks: most of Part II may not apply, Part IV stays empty unless an efficacy study is imposed, and Part V can be a statement that the product information matches the originator’s, if the originator has no additional measures.

Risk management system: a set of pharmacovigilance activities and interventions designed to identify, characterise, prevent or minimise risks relating to a medicinal product, including the assessment of the effectiveness of those activities and interventions.

Directive 2001/83/EC, Article 1(28b); the plan, in Article 1(28c), is “a detailed description of the risk management system”
What it holdsWhere it is written
Part IProduct overview: substance, holder, indications, formsGVP Module V, V.B.4
Part IISafety specification in eight modules, from epidemiology and trial exposure to the list of safety concernsImplementing Regulation, Article 30(1)(a); GVP V.B.5
Part IIIPharmacovigilance plan: routine activities and the studies that will characterise the concerns, marked voluntary or imposedImplementing Regulation, Article 30(1)(b) and (3); GVP V.B.6
Part IVPost-authorisation efficacy studies imposed as conditions; empty when none areDirective, Article 21a(f); GVP V.B.7
Part VRisk minimisation per concern: routine, additional with a justification, and how effectiveness is measuredImplementing Regulation, Article 30(1)(c); GVP V.B.8
Part VIThe summary, one per product, public on the medicines web-portalsDirective, Article 106(c); Implementing Regulation, Article 31
Part VIIAnnexes 1 to 8: study tables and protocols, follow-up forms, the additional measures in detail, the changes over timeGVP V.B.10

The plan is updated whenever the list of safety concerns or an additional activity changes; only the modules concerned need be sent, and every version carries its own number and date. The Pharmacovigilance Risk Assessment Committee (PRAC) assesses central plans through a rapporteur; national authorities assess the rest, and can demand a first plan from a medicine that never had one.

Don’t confuse it with: the periodic safety update report

Risk management plan

Looks forward

  • Asks: what do we still need to learn, and how will we keep patients safe meanwhile
  • Timing: with the application, then whenever the concerns or measures change
  • Output: a plan of studies and measures

Periodic safety update report (PSUR)

Looks back

  • Asks: does the benefit still outweigh the risk, on everything learned in the period
  • Timing: on the schedule written into the licence
  • Output: an integrated benefit-risk assessment

Complementary, not interchangeable. When a report concludes that a new risk matters, the plan submitted with it adds the concern and says what will be done about it.

Chapter 3

What happens when the plan is not followed?

The plan is a promise, and inspectors check it. The Medicines and Healthcare products Regulatory Agency (MHRA), the United Kingdom (UK) regulator, grades what it finds; its report for April 2019 to March 2020 shows a plan going wrong.

5critical findings from 22 inspections that year, all in risk management: three on keeping the reference safety information current, one on additional risk minimisation measures, one on the studies in Part III. Risk management also drew 30 percent of the 76 major findings.

The measures finding: a company had not put in place the educational materials its plan promised for a medicine sold for over two years, on important risks and overdose through medication error. The same failure had been graded critical at the previous inspection, and was again.

After Brexit the UK keeps the EU template, adds a UK annex where its details differ, and has additional measures agreed with the MHRA before use. In the EU the plan is no longer private: since 20 October 2023 the European Medicines Agency publishes the main body and annexes 4 and 6 of every centrally authorised medicine, in place of the old summaries.

Chapter 4

Test yourself

Myth or Truth? Pick an answer to see the explanation.

“Every medicine on the EU market has a risk management plan.”

MythYou got it.Not quite.

Every new application carries one, but licences granted before 21 July 2012 need none unless an authority imposes it or a significant change brings it in.

“Anyone can read the plan of a centrally authorised medicine online.”

TruthYou got it.Not quite.

Since 20 October 2023 the agency publishes the main body and annexes 4 and 6 on each medicine’s page, for initial evaluations and updates alike.

“Once a risk is in the plan, it stays there for the life of the medicine.”

MythYou got it.Not quite.

The plan is dynamic: concerns are reclassified or removed as the profile firms up, and studies leave once completed. Only some measures, such as pregnancy prevention programmes, stay for life.

Sources (6)

Last reviewed against these 6 sources. Every page is reviewed at least every six months.