PSMF (Pharmacovigilance System Master File)
What does the whole system look like on paper?
In one sentence
The PSMF is the single document describing a company's whole pharmacovigilance system, kept current in the European Union and ready within 7 days.
In the European Union (EU) every marketing authorisation holder must maintain one and make it available on request. It is not a form filed once: it is a described system, with a logbook of its changes, kept where the main safety work happens or where the qualified person responsible for pharmacovigilance (QPPV) works.
Think of it like this
A building keeps one set of plans showing every room, pipe and fire exit, redrawn whenever something is rebuilt, so the fire inspector never has to guess. The PSMF is that set of plans for a company’s drug safety work.
Key insights
A holder may run separate systems for different kinds of products, and one system may serve several holders. Each system gets exactly one master file and one qualified person; together the files cover every authorised product.
A national authority may ask for a copy at any time and must have it within 7 days. A new address for the file or a new qualified person goes into the Article 57 database immediately, and within 30 calendar days at the latest. Chapter 2.
Every change to the main sections in the last five years is logged with date, person and reason; deviations stay in the file until resolved; the file carries a version and a last-updated date. Chapter 1 shows what a change does to it.
In 2017/18 the United Kingdom inspectorate graded 18 findings on master file management alone, and one critical finding where the file did not represent the system. Chapter 3.
Jump to: 1 Where a change lands 2 Who sees it 3 Inspection 4 Test yourself
Chapter 1
Something changes in the system. Where does it land in the file?
Pick a change. The parts of the file it touches light up, and the text says what must be written and by when, under Commission Implementing Regulation (EU) No 520/2012 and the European Medicines Agency’s good pharmacovigilance practices (GVP) Module II.
Section 1 is rewritten, and the database is told. The new person’s responsibilities, curriculum vitae with proof of EudraVigilance registration, contacts and back-up replace the old, and the newcomer accepts the system in writing. The Article 57 database is updated within 30 calendar days, with no variation needed. The curriculum vitae and contacts are the one change the logbook skips. Implementing Regulation, Articles 2(1), 4(4) and 5(4); GVP Module II, II.B.2.2 and II.B.2.3
The organisation section and the contracts list change. The file must describe every subcontracted activity, list the subcontracts with the products and territories concerned, and name the sites where cases are collected, assessed and entered. The qualified person is told promptly; the entry goes into the logbook. The holder keeps full responsibility for the file’s completeness and accuracy. Implementing Regulation, Articles 2(2) and (6), 3(3) and 6; GVP Module II, II.B.2.3
A note goes on the file until the fixes are done. The directive requires a note of the main audit findings on the master file and a corrective action plan; the note may be removed only once the actions are fully implemented. The annex lists every audit scheduled and completed over five years, and even a corrective plan not yet agreed is noted. Directive 2001/83/EC, Article 104(2); Implementing Regulation, Article 3(5); GVP Module II, II.B.4.7
Only the cover changes, and the database. The file must sit at the EU site of the main pharmacovigilance work or where the qualified person operates (Norway, Iceland and Liechtenstein count), at a physical office address; an electronic file counts if its data is directly accessible there. The agency is told immediately, the Article 57 database within 30 calendar days, and the file must stay permanently and immediately available for inspection at the new address. Implementing Regulation, Articles 4(4) and 7(1) and (3); GVP Module II, II.B.2.2
The performance section and the annex show it. The file must explain how correct reporting is assessed and carry, in the annex, a year of figures for 15-day and 90-day timeliness. A deviation from the procedures, its impact and how it is managed stay documented in the file until resolved. Implementing Regulation, Articles 2(5)(c) and 4(3); GVP Module II, II.B.4.6
Section 4 is rewritten. The file describes the location, functionality and operational responsibility of every system used to receive, record and report safety data, with an assessment of its fitness for purpose; the sources of data that feed it are described in section 3. The change is logged with its date, person and reason. Implementing Regulation, Articles 2(3) and 5(4); GVP Module II, II.B.4.4
Chapter 2
Who gets to see it, and when?
The file lives at the company. The law says who may open it, how fast a copy must travel, and what the public sees.
Guess first
A national authority writes and asks for a copy of the master file. How long does the company have?
You got it.Not quite.Seven days at the latest after the request arrives, electronic or as a clear printout. The authority may ask for specific modules only, and the holder pays for the copy. At its own address the file must be available at once, inspection announced or not.
The national competent authority may at any time ask the marketing authorisation holder to submit a copy of the pharmacovigilance system master file. The marketing authorisation holder shall submit the copy at the latest 7 days after receipt of the request.
Directive 2001/83/EC, Article 23(4): any time, seven days
| What they get | Where it is written | |
|---|---|---|
| The assessor | At application, only a summary in module 1.8.1: proof of a qualified person, that person’s Member State and contacts, a signed statement of means, and where the file is kept; the file itself only ad hoc | Directive, Article 8(3)(ia); GVP Module II, II.B.2.1 and II.C.2 |
| The authority | A copy within 7 days, whole or by module, at the holder’s cost; a copy of the logbook at regular intervals if asked | Directive, Article 23(4); Implementing Regulation, Article 7(4) and (5) |
| The inspector | The file itself, permanently and immediately, at its registered address, announced or unannounced | Implementing Regulation, Article 7(3); GVP Module II, II.C.2 |
| The qualified person | Permanent access, and prompt notice of every change that matters to oversight | Implementing Regulation, Article 7(2); GVP Module II, II.B.2.3 |
| The public | The file’s location, on the European medicines web-portal | Regulation (EC) No 726/2004, Article 26(1); GVP Module II, II.C.3 |
It is written in English unless the holder is authorised in one Member State only, and may be electronic if a clear printout can be produced.
Don’t confuse it with: the pharmacovigilance system summary
Master file
The system, described in full
- Lives: at the company, in the EU, under version control
- Holds: seven sections, an annex of lists, a logbook
- Seen: on request within 7 days, and at inspection
System summary
Five facts in the application
- Lives: in module 1.8.1 of the dossier
- Holds: proof of a qualified person, their Member State and contacts, a signed statement of means, the file’s location
- Seen: by the assessor, with every application
The summary tells the assessor a system exists and where its description is. The master file is the description.
Chapter 3
What do inspectors find in it?
Inspectors read the file before they arrive; it shapes the visit. The Medicines and Healthcare products Regulatory Agency (MHRA), the United Kingdom (UK) regulator, publishes what its inspections find, and the master file has its own line.
18findings on master file management in the year to March 2018, 11 major and 7 minor: the most common finding on information provided for supervision, from 22 inspections.
A major finding typically bundles several faults: inaccurate content, required content missing, or the wrong format. One critical finding that year came from a system not fully represented in its file, which hampered the planning and conduct of the inspection. By 2021/22 the MHRA tracked master file management as its own topic and reported only a small number of findings.
After Brexit the UK kept the requirement: a UK master file describing the global system, reachable electronically from the UK, with a UK file number per system.
Chapter 4
Test yourself
Myth or Truth? Pick an answer to see the explanation.
“Regulators review the full master file before approving every new medicine.”
The application carries only the summary, including where the file is kept. The file is not routinely requested before authorisation, though it can be, for instance for a brand-new system.
“A holder with headquarters outside the EU may keep its master file there.”
It must be located in the EU, or in Norway, Iceland or Liechtenstein, at the site of the main pharmacovigilance work or where the qualified person operates.
“Several companies can share one master file.”
When holders share one pharmacovigilance system, one file describes it. Each must be able to hand it to an authority within 7 days, so access is fixed in written agreements.
Sources (6)
- Directive 2001/83/EC, consolidated text, Articles 1(28e), 8(3)(ia), 23(4) and 104 (EUR-Lex)
- Commission Implementing Regulation (EU) No 520/2012, Chapter I, Articles 1 to 7 (EUR-Lex)
- European Medicines Agency: GVP Module II, Pharmacovigilance system master file (Rev 2), 28 March 2017 (PDF)
- MHRA: Pharmacovigilance requirements, qualified person for PV and PSMF, gov.uk guidance updated 8 January 2025
- MHRA: Pharmacovigilance Inspection Metrics Report, April 2017 to March 2018 (PDF)
- MHRA: Pharmacovigilance Inspection Metrics Report, April 2021 to March 2022 (PDF)
Last reviewed against these 6 sources. Every page is reviewed at least every six months.