1

PMCF (Post-Market Clinical Follow-up)

Say it: “P-M-C-F”, letter by letter · a loop that runs for the device’s life

In one sentence

Post-Market Clinical Follow-up (PMCF) is a manufacturer’s ongoing collection of clinical data on a medical device sold in the European Union (EU).

A device must stay safe and work as promised for its whole expected lifetime, which evidence gathered before launch cannot confirm alone. So the manufacturer has to go looking for data, not just wait for complaints.

1PlanPMCF plan
2CollectClinical data from real use
3EvaluatePMCF evaluation report
4UpdateClinical evaluation, risks

Think of it like this

A new bridge keeps getting inspected for years after it opens. It passed every design test, but only real traffic shows how it holds up over time.

Jump to: Try it At a glance Don’t confuse it with Test yourself (2 questions)

Try it: what does each class owe after launch?

Under the EU Medical Devices Regulation (MDR), PMCF findings travel in reports whose pace grows with the risk class. Pick a class to see what follows launch.

Pick a device class

Safety report

Post-market surveillance report, updated when necessary, shown to the competent authority on request

PMCF evaluation report

Updated on the schedule the PMCF plan justifies

Public summary

Not required

Article 85Lowest risk, lightest reporting, but PMCF still applies.

Safety report

Periodic safety update report (PSUR), updated when necessary and at least every two years

PMCF evaluation report

Updated on the schedule the PMCF plan justifies

Public summary

Not required, unless the device is implantable

Article 86The PSUR sets out the main PMCF findings next to the benefit-risk conclusions. It goes to the notified body and, on request, to competent authorities.

Safety report

PSUR, updated at least once a year

PMCF evaluation report

Updated on the schedule the PMCF plan justifies, unless the device is implantable

Public summary

Not required, unless the device is implantable

Article 86The same report as class IIa, at twice the pace.

Safety report

PSUR at least once a year, submitted through the EU electronic system to the notified body, which reviews it and adds its evaluation

PMCF evaluation report

Updated at least once a year

Public summary

Summary of safety and clinical performance, public, updated at least yearly with PMCF data where indicated

Articles 32, 61 and 86The strictest cycle: every report runs on a yearly clock.

Safety report

PSUR at the pace of its class, always submitted through the EU electronic system to the notified body

PMCF evaluation report

Updated at least once a year, whatever the class

Public summary

Summary of safety and clinical performance, written for users and, where relevant, patients

Articles 32, 61 and 86For these three duties, the MDR groups implants with class III.

Custom-made and investigational devices follow separate rules.

At a glance

Legal basisRegulation (EU) 2017/745 (the MDR), Article 61 and Annex XIV, Part B
Who does itThe manufacturer, for every risk class, unless it justifies why PMCF does not apply
Key documentsPMCF plan (part of the post-market surveillance plan); PMCF evaluation report (part of the clinical evaluation report)
Checked byThe notified body, the organisation designated to certify the device, if one is involved
In vitro diagnosticsPost-market performance follow-up (PMPF), under Regulation (EU) 2017/746
United States (US)No direct equivalent

Did you know?

In force since

2021

The MDR applies from 26 May 2021, not 26 May 2020 as first set: the coronavirus disease (COVID-19) outbreak pushed it back.

By the numbers

8

Items every PMCF plan must at least include, from its methods to a justified time schedule.

Heads-up rule

30 days

A PMCF investigation adding invasive or burdensome procedures is notified to the Member States concerned at least 30 days before it starts.

PMCF shall be understood to be a continuous process that updates the clinical evaluation…

Seen in the wild: Regulation (EU) 2017/745, Annex XIV, Part B, Section 5, which defines PMCF

Don’t confuse it with: post-market surveillance (PMS)

PMCF

Post-Market Clinical Follow-up

  • Clinical data only, from use of the marketed device in people
  • Keeps the clinical evaluation current throughout the device’s life
  • One part of the PMS plan, not the whole of it
  • Example: a PMCF study or a registry following patients who use the device

PMS

Post-Market Surveillance

  • All experience with the device: incidents, complaints, trends, literature, similar devices
  • Feeds everything: risk management, design, labelling and the clinical evaluation
  • The whole system, part of quality management and sized to the risk class
  • Example: analysing user complaints and incident trends

How does one PMCF loop run?

  1. Plan. The PMCF plan sets aims such as confirming safety and performance, finding unknown side effects and emerging risks, and spotting off-label use. The Medical Device Coordination Group (MDCG), where EU Member States agree shared guidance, offers a template (MDCG 2020-7).

  2. Collect. General methods such as user feedback and literature screening, plus specific ones such as registries or PMCF studies. The template adds surveys and real-world evidence (RWE) analyses of reliable real-world data (RWD), but rejects retrospective surveys without a statistical rationale.

  3. Evaluate. The manufacturer analyses the findings in the PMCF evaluation report (template: MDCG 2020-8).

  4. Update. The conclusions feed the clinical evaluation and risk management; any preventive or corrective measures they call for must be taken.

Skipping PMCF takes a written justification, which the notified body assesses. A class III or implantable device that skips its own clinical investigation by claiming equivalence needs post-market studies in its plan.

How does the US follow devices after approval?

The US Food and Drug Administration (FDA) orders postmarket studies device by device instead.

Section 522 surveillance

Under Title 21 of the Code of Federal Regulations (CFR), Part 822: class II and III devices whose failure would likely cause serious harm, implants staying over a year, life support outside a user facility, or significant use in children. Surveillance can run up to 36 months.

Post-approval studies

For premarket approval (PMA) devices, the FDA can make continuing evaluation a condition of approval, naming how many patients to follow (21 CFR 814.82). Non-compliance can cost the approval.

The EU difference

No order needed: under the MDR, follow-up is built into every device’s clinical evaluation, designed by the manufacturer.

A US study is ordered case by case; EU PMCF runs for every device, for its whole expected lifetime.

Common Misconceptions

Myth or Truth? Pick an answer to see the explanation.

“PMCF is simply the medical device version of a post-authorisation safety study (PASS).”

MythYou got it.Not quite.

A PASS is a study of an authorised medicine with a specific safety aim. PMCF is a continuous process inside every device’s clinical evaluation, and studies are just one of its methods.

“An EU notified body can require a manufacturer to run specific PMCF studies.”

TruthYou got it.Not quite.

Under Article 56(3) of the MDR, notified bodies can require specific PMCF studies or restrict a device to certain patient groups.

Sources (10)

Last reviewed against these 10 sources. Every page is reviewed at least every six months.